Aluminia Refinery lifts off with Alimak Hek downunder

Comalco Alumina Refinery, Gladstone, Queensland, Australia

In 2004, three Alimak rack & pinion lifts of stainless steel were installed to provide access for maintenance and services at the Comalco Aluminia Refinery in Australia.

During construction of the Comalco Alumina Refinery (CAR) project in Australia, Comalco relied on three Alimak rack & pinion lifts operated in construction site ‘hoists’ style mode of operation, which allowed contractors to meet critical completion schedules, before reverting to industrial access operations as the process lines were handed over for commissioning.

Construction of Australia’s first Greenfields refinery to be built in the past decade in Australia is currently moving from a commissioning to operations phase; with three Alimak industrial lifts reverting from essential construction site duties conveying materials and labour to conventional permanent lifting duties providing access for maintenance and services.

The three Alimak lifts – two SE 1600 FC and an SE 2400 FC – operating in a construction site mode allowed the contractors of the Comalco Refinery, located in Gladstone, Queensland 530 km north of Brisbane to meet critical completion dates, finishing on-schedule.

A spokesman for the CAR project main engineering, procurement and construction contractor Bechtel Australia Pty Ltd stated that the Alimak industrial lifts were specified for their record of reliability, performance and ease of installation with the elimination of constructing a permanent lift shaft; relying instead on proven rack and pinion techniques.

The first phase of the Comalco Alumina Refinery has been designed to produce 1.4 million tonnes of alumina per year which can be incrementally expanded in later phases to produce more than 4 mtpa. Construction of phase 1, at an estimated cost of US $750 million, started in 2002.

Biggest in Queensland

Installation of the largest of the three Alimak lifts on the alumina calcinations building was completed in March 2004. Forming part of the Theiss Goldings Joint Venture contract, the installation proved the most challenging. Needed urgently by Theiss Goldings to undertake construction mode lifting duties, meant constant critical installation schedules being met.

Initially installed at the fourth floor level as a construction lift carrying people and materials, it was extended floor by floor as building progressed to the seventh floor with a final lift height of 44 m.

The Alimak lift was purposely positioned to sit between two ‘lobster back’ process units as a ‘tailor made’ installation including an area of limited space, allowing vehicle access past the plant and easy reversing and unloading into the lift area.

Since its installation at the end of March, the lift has ‘clocked’ 920 hours operation in six months. Travelling at 0.6 m/sec this equates to almost 1600 km (1000 miles).

Featuring a 2400 kg capacity and car dimensions of 2210 mm x 1560 mm, the high payload capacity lift is one of two SE 2400 FC’s to be installed in Australia – the first being at Comalco’s bauxite mine in Weipa, Northern Territories. Throughout Australia more than 100 permanent Alimak lifts have been installed.

Precipitation tanks

The first of the three Alimak lifts was installed in July 2003 providing specialist USA steel tank contractor Chicago Bridge & Iron (CBI) with construction style ‘hoist’ duties for the projects precipitation tanks.

Featuring a final lift height of 30.5 m, the SE 1600 FC has today reverted to industrial lift duties over the four floors. It provides access to the tanks and the adjacent hydrate washing processes.

Contract 330 – John Holland

Sub-contractor, John Holland has also relied on a second Alimak SE 1600 FC during construction of the plants 4- storey high liquor filtration process line in contract 330. With a travel distance of 22 m, the lift was installed earlier this year. Both SE 1600 FC lifts installed on the Comalco site feature a 1600 kg capacity and a travel speed of 0.8 m/s.

On-site power supply

With an on-site power supply rating of 690 V, the Alimak Hek installation team had to install transformers to each lift assembly to step-down the voltage to 420 V operation at 50 Hz.

All three lifts were specified by Comalco as stainless steel cars together with all landing doors. The masts for contracts 330 and 490 feature a galvanised finish with the unit for contract 420 painted to meet a higher specification.

The Alimak lifts all feature ‘frequency controlled’ operation ensuring ‘soft start’ and ‘soft stop’ providing maximum comfort.

Boilerhouse

Contractors are also relying on an Alimak Scando 20/32 construction hoist with a 2000 kg capacity and a 3.2 m long car for lifting duties on the boilerhouse.

A 45 m high structure, the hoist ensures every maintenance and service access to various levels of the boilerhouse. A replacement to an industrial Alimak lift is anticipated in the near future.

The units 3.2 m extended length is a local health and safety requirement to allow a stretcher in the unlikely event of an emergency.

Alimak lifts

The range of Alimak industrial lifts feature a modular build with up to 30 different car sizes, measuring 0.78 m x 1.04 m – 1.56 m x 3 m and travel speeds of up to 1 m/sec. Lifting heights in excess of 250 m can be obtained using the rack and pinion techniques able to lift capacities of between 300 kg – 2400 kg.

A recent report in the USA quoted that the cost of stairs-related falls annually within the States is estimated to be in the region of US$ 15 billion. Clearly the use of industrial-style permanent lifts can eliminate many of the accidents.

Hek post-tension duties

Following construction by Bechtel of two 40 m high concrete final product storage silos, four Hek platforms were used to allow access for post-tensioning of the reinforcement bars. The platforms were positioned on four buttresses around the perimeter of each 40 m diameter silo.

Throughout construction of the refinery, contractors also used three additional Alimak Scando rental hoists.

Comalco

Alumina produced from the first stage of CAR will be shipped to Comalco’s smelters in Tasmania and New Zealand. The company has also signed a long term supply agreement with the Norwegian company Hydro Aluminium to supply 300,000 t of alumina in 2005 and 500,000 t a year from 2006-2030. This represents one of the biggest alumina agreements ever signed.

Comalco is a wholly owned subsidiary of Rio Tinto and is a major supplier of bauxite, alumina and aluminium products for the world markets.

Elevator details

Location
Comalco Alumina Refinery, Gladstone, Australia
Installation year
2003–2004
Application
Aluminia Refinery
Lift type
Rack & Pinion
Lift model
ALIMAK SE 1600 FC & 2400 FC
No. of lifts
3
Capacity
1600 kg & 2400 kg
Lifting height
Varies between 22 m – 44 m
Comalco Alumina Refinery